DCP 012
WORKOVER AND COMPLETION OPERATION
Why
Choose this Training Course?
Work-over is performed after the initial
completion to re-establish commercial production or injection, repair of a
mechanical problem in the well, or plug and abandon the well. Work-over
operations are usually initiated as hydrocarbon production rates decline
substantially. Undesired fluid production could be the result of a poor primary
cement job or water/gas coning. These work-overs typically involve a remedial
cement job to control the unwanted water/gas production.
Well completion is performed at the
completion of drilling operations to establish initial production from or
injection into a well. Procedures of completion will vary depending on the
completion type and the area. For Example flowing wells can simply be
perforated and put on production. Low reservoir pressure areas often require an
artificial lift mechanism (rod or submersible pump, gas lift valves, etc.) to
produce at economic rates.
This Galaxy Oil & Gas Trainings course will highlight:
Training Objectives
What are
the Goals?
By the end of this Galaxy Oil& Gas Trainings
course, participants will learn to:
Target
Audience
Who is
this Training Course for?
The
course is designed for those
involved in the work over operations and completion design:
Training
Methods
How will
this Training Course be presented?
Participants will engage in a highly
interactive learning experience, with a blend of class room learning,
exercises, group work and discussion. The instructor will apply a range of
proven adult learning teaching and facilitation techniques, which will address
participants’ learning preference styles. Active participation is essential, to
share experiences and expertise of the tutor, as well as the participants. We
can all learn from each other.
Organizational
Impact
Organization will gain (direct and
indirect) the following:
Personal
Impact
Personnel will gain the following:
Daily
Agenda
Day One:
Types of Completions
Day Two:
Reasons for Work-overs and Well Preparation
Day
Three: Overview of Surface and Subsurface Well-bore Equipment &
Procedures
Day Four: Barriers, Completion and
Work-over Fluids
Day Five:
Kick Causes, Warning Signs, Kill Methods, Risk Awareness & Organizing a
Well Control Operation, Natural Flowing & Artificial Well Work Over
Programs
Certificate Awarded
Certificate of Completion will be awarded
to Participants.
Duration: 5 Days
As the Super Admin of our platform, I bring over a decade of experience in managing and leading digital transformation initiatives. My journey began in the tech industry as a developer, and I have since evolved into a strategic leader with a focus on innovation and operational excellence. I am passionate about leveraging technology to solve complex problems and drive organizational growth. Outside of work, I enjoy mentoring aspiring tech professionals and staying updated with the latest industry trends.
No Review found